Project: ecadorette   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Eric Cadorette   -  
Project:   Sling 4 TSI   -   VIEW REPORTS
Start/Last Date:Nov 15, 2021 - No Finish Date
Engine:915IS
 
Friendly URL: https://eaabuilderslog.org?s=ecadorette

Home or Last Project Picture

Oct 23, 2022     Pitot install       Category: Avionics
I installed the GAP 26 heated and regulated pitot probe. I had to install some nut plates to mount the regulator, bend the tubes from the pitot and flare the ends for the AN fittings. After that I had to figure out what kind of electrical connectors. I ended up using seal all weather tight connectors. I didnt realize at first that I could use different size wire with the outer shells of the connectors, I just had to use different size pins and sockets. My only concern is how close the probe and wires are to where the aileron push pull tube will go. I am giving sling the shadow of a doubt that it will clear. I dont have the aileron push tube, its in the finishing kit so I will have to deal with that later if it is a problem. Fingers crossed.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.